hotelrenolog

On Time, On Budget, With Peace of Mind

PROJECTS

Coast Victoria Hotel & Marina by APA

LOCATION: Victoria, BC

ROOMS: 132 Guest Suites & Bathrooms

DURATION: 7 Months

PROJECT SCOPE: 132 guest suite and bathroom renovations including demolition, installation of new hard surface flooring, skim coating and new drywall, wall covering application, millwork installation, plumbing fixture installation, bathroom vanity installation, tile installation, and finish painting.

Photos generously licensed by © Coast Victoria Hotel & Marina by APA

Coast Bastion Hotel

LOCATION: Nanaimo, BC

ROOMS: 179 Guest Suites, Floors 3-15 Public Corridors

DURATION: 6 Months

PROJECT SCOPE: Full guest suite and corridor renovation including demolition of existing finishing, skim coating, drywall finishing, hard surface and carpet installation, millwork installation, wall covering installation, lighting installation & finishing painting.

Photos generously licensed by © Coast Bastion Hotel

Fairmont YVR (Phase 1)

LOCATION: Richmond, BC

ROOMS: Gold Floor Lounge, Guest Suites, & Public Corridors

DURATION: 3 months

PROJECT SCOPE: Gold floor guest suite, corridor, & lounge upgrades including demolition, skim coating and new drywall, installation of new carpet and wallcovering, installation of new hardwood floors, millwork, and finishing painting.

Fairmont YVR (Phase 2)

LOCATION: Richmond, BC

ROOMS: Guest Suites, & Public Corridors

DURATION: 3 months

PROJECT SCOPE: Guest suite, corridor, upgrades including demolition, skim coating and new drywall, installation of new carpet and wallcovering, installation of new hardwood floors, millwork, and finishing painting.

Crystal Lodge Hotel & Suites

LOCATION: Whistler, BC

ROOMS: 80 Guest Suites & Common Areas

DURATION: 3 months

PROJECT SCOPE: Full room and corridor renovation, new washrooms, flooring, wall coverings, paint, millwork, electrical upgrades, plumbing upgrades, and re-fresh of the kitchens.

Westin Whistler (Phase 1)

LOCATION: Whistler BC

ROOMS: Lobby, Pre-Function Area, Emerald Ballrooms, Common Washrooms & Corridors

DURATION: 2 Months

PROJECT SCOPE: Full demolition of existing finishing in the ballrooms, corridors, and common washrooms. Installation of new flooring, wallcoverings, paint, and millwork. Construction of a new feature stairwell with living wall and finally FF&E installation.

Westin Whistler (Phase 2)

LOCATION: Whistler BC

ROOMS: Registration Area, Business Centre, & Upper Stairwell

DURATION: 2 Months

PROJECT SCOPE: Full demolition and removal of existing finishings and FF&E. Installation of a new lobby mechanical system, carpet, tile, paint and millwork. Installation of new check in desks, data hookups, and electrical re-wiring.

Holiday Inn Metrotown

LOCATION: Burnaby, BC

ROOMS: 98 Guest Suites, Public Corridors, Level 3 Meeting Rooms

DURATION: 5 Months

PROJECT SCOPE: 98 guest room upgrades including new wallcoverings, closet conversion to refreshment centers, new flooring, baseboards, suite door refresh, bathroom vanity refresh, and fresh paint on ceiling, door jams, & window frames. Public hallway upgrades includes installing digital wallcoverings on each elevator landing, new wallcoverings, baseboards, flooring, retiling of ice & laundry room, stairwell painting, and installation of new hallway ceilings. Level 3 meeting room upgrades include new wallcoverings, baseboards, & flooring.

The Sunset

LOCATION: Vancouver, BC

ROOMS: 50 Rooms, Common Spaces, & Building Exterior

DURATION: 4 Months

PROJECT SCOPE: Complete building renovation including removal of existing finishing, renovations of the lobby, common hallways, all guest suites, and refreshing of the exterior balconies and other exterior areas of the building.

Westin Bayshore Hotel

LOCATION:  Vancouver, BC

DURATION: 2 months

PROJECT SCOPE: Renovating lobby space for a new coffee shop. Included demolition, asbestos and lead abatement, installation of new millwork, stonework, tile, painting, & FF&E installation.

Cascade Lodge

LOCATION: Whistler BC

ROOMS: Common Corridors, Lobby, & Laundry Rooms

DURATION: 2 months

PROJECT SCOPE: Refinishing of the common corridors, lobby, and laundry rooms including wallpaper installation, ceiling refinishing, paint, carpet, & millwork refinishing.

Hampton Inn & Suites (Phase 1)

LOCATION: Vancouver, BC

ROOMS: Boardrooms, Sauna, Common Washrooms, & Laundry Rooms

DURATION: 2 months

PROJECT SCOPE: Refinishing of the common boardrooms including installation of new wallpaper and millwork. Installation of new tile and wallcoverings in common washrooms. Complete teardown and rebuild of the common sauna. Installation of new wallcovering and flooring in laundry room.

Hampton Inn & Suites (Phase 2)

LOCATION: Vancouver, BC

ROOMS: 132 Guest Washrooms and Kitchenettes

DURATION: 3 months

PROJECT SCOPE: Complete renovation of all guest washrooms including replacement of tile, new wallpaper, painting, installation of washroom vanities, and conversion from bathroom tubs to shower pans.

Ramada (Phase 1)

LOCATION: Vancouver, BC

ROOMS: Building Envelope Renewal & Guest Suites

DURATION: 2 months

PROJECT SCOPE: This building is over 100 years old so in conjunction with an Engineer we devised a system of temporary anchors to get the work completed. Exterior work included lead abatement, welding repairs to fire escapes, new stucco installation, new exterior lighting, installation of a new torch on roof, new decking, new awnings and new paint.   Additionally, we converted their office spaces to guestrooms. 

 

Ramada (Phase 2)

LOCATION: Vancouver, BC

ROOMS: Lobby & Ground Floor Washrooms

DURATION: 1 months

PROJECT SCOPE: Demo & replacement of existing lobby millwork, wallcoverings, tile, & carpeting. Demo of existing ground floor washrooms and installation of new tile, rough in new waterlines and drains, installation of new plumbing fixtures, wallcoverings, and finishing paint.

Holiday Inn Vancouver Centre

LOCATION: Vancouver, BC

ROOMS: 200 Guest Suites, Common Corridors, Lobbies, Restaurant, and Exterior Restoration

DURATION: 7 months

PROJECT SCOPE: Complete interior upgrade including guest rooms and hallways, all ballrooms, lobbies, meeting rooms and restaurant / lounge as well as complete exterior concrete restoration and painting.

Holiday Inn Metrotown

LOCATION: Burnaby BC

ROOMS: Lobby and Restaurant

DURATION: 4 months

PROJECT SCOPE: Full renovation of lobby and restaurant – flooring, millwork, wallcoverings, stone, doors, electrical upgrades.

Fairmont Hotel Vancouver

LOCATION:  Vancouver BC

ROOMS: 225 Guest Suites, Common Corridors

DURATION: 10 months

PROJECT SCOPE: Guest room and corridor upgrades including demolition, lead and asbestos abatement, plumbing, electrical, new drywall in washrooms, conversion of tubs to showers, concrete work, tile and mosaic installation, flooring installation, installation of new millwork and stone, painting, and wallcoverings.

Delta Vancouver Airport Hotel

LOCATION: Richmond, BC

ROOMS: 420 Guest Suites, Common Areas, & Meeting Rooms

DURATION: 8 months

PROJECT SCOPE: Complete interior upgrade, including all guest rooms, guest hallways, ballrooms, washrooms and lobbies. Finishing & structural changes, plumbing, electric, tiling, and carpentry.

Four Seasons Hotel

LOCATION:  Vancouver, BC

ROOMS: 398 Guest Suites, Common Hallways, and Meeting Rooms

DURATION: 7 months

PROJECT SCOPE: Complete interior upgrade, including guest rooms, guest hallways and meeting rooms.

Sheraton Wall Center

LOCATION:  Vancouver, BC

ROOMS: 260 Guest Suites

DURATION: 1 month

PROJECT SCOPE: Refinishing walls, doors, ceilings and millwork within each guest suite.

Sutton Place Hotel

LOCATION:  Vancouver, BC

ROOMS: 360 Guest Suites, Common Hallways, and Swimming Pool

DURATION:  6 months

PROJECT SCOPE: Refinishing of all guest rooms, guest hallways, and swimming pool including new wallcoverings, refinishing entry doors, refinishing ceilings, refinishing of millwork, and restoration of existing common swimming pool.

Empire Landmark Hotel

LOCATION:  Vancouver, BC

DURATION: 1 month

PROJECT SCOPE: Repainting of the revolving restaurant’s interior including bus stations, bars, seating areas, and entry.

Cascadia Hotel & Suites

LOCATION:  Vancouver, BC

DURATION: 1 month

PROJECT SCOPE: Demolition, installation, and re-finishing of ceilings in relation to a major HVAC system upgrades.

Quality Inn Hotel

LOCATION: Vancouver, BC

DURATION: 2 months

PROJECT SCOPE: Interior common area repainting, building envelope repairs and exterior painting.

Marriott Pinnacle Hotel

LOCATION: Vancouver, BC

DURATION: 1 month

PROJECT SCOPE:Exterior sealant replacement and stucco repair, remove and replace wall coverings in washings and change rooms, remove and replace caulking around showers/tubs and grout in guest rooms, re-glue wall vinyl where peeling.

Executive Hotel

LOCATION: Richmond, BC

DURATION: 1 month

PROJECT SCOPE: Repainting of all interior common hallways and lobbies.

.

Opus Hotel

LOCATION: Vancouver, BC

DURATION: 1 month

PROJECT SCOPE: Removal and replacement of all exterior sealants.

.